Page 34 - Technology Compendium
P. 34

CSIR-IMMT/EXM - 05

              High pure metals from spent catalysts, sludge’s, secondary’s, effluents, primary and
              low-grade ores

            Advantages / Salient Technical Features
            •  Qualities of the final products are at par with produced
               metals  from  primary  resources  and  processes.  Low
               grade,  complex  materials,  industrial  wastes,  effluents
               and  secondary resources can  be successfully  used  as
               raw materials.
            Problem being addressed
            •  Environmental clean-up
            •  Indigenous  process  for  Extraction  of  critical  energy
               storage metals and other metals of commercial value
               from low grade ores and other secondaries
            •  Import substitution of the said metals
            •  Fulfilment of Aatma Nirbhar Bharat

            Environmental Considerations (if any)
            •  Employs hydrometallurgical unit operations which are
               environment benign processes.

            Major Raw Materials to be Utilized
            •  Spent catalysts, sludge’s, secondary’s, effluents, primary   copper from low grade Malanjkhand oxide ore
                                                                      having  bio-heap  leaching,  solvent  extraction
               and  low-grade ores. Commercial  grade chemicals will
                                                                      and electrowinning unit operations.
               be used in the process.                              •  Pilot scale studies for recovery of Ni from spent
            IPR Status / Details (India/Abroad)                       catalyst
            •  A Process for extraction of Ni from low grade chromite
               ore,  International  Patent  Nos.:  WO  20055225,  AU   Commercialization Status
                                                                    •  Following technologies have been transferred
               2002348824, BR 200215990, EP 1697549.
                                                                      / commercialized
            •  Improvements  in  or  relating  to  a  process  for  the   •  Recovery  of    nickel  from    refinery  spent
               extraction  of  copper  lead,  zinc  metal  values  from
               complex  sulphide  ores/concentrates, Indian  Patent   electrolyte  (150  m3/day,  M/s  Hindalco  Ind.
                                                                      Ltd, Birla Copper Unit, Dahej)
               No.158990 (1985).                                    •  Recovery of  Co from Co sludge/scrap (100 tpa
            Application/Uses                                          Co, M/s Rubamin Ltd., Baroda)
            •  High pure (electrolytic grade) metals for manufacturing   •  Extraction  of  Zn  and  Cu  from  brass  ash,  Zn
                                                                      ash (105 tpa Zn & 30 tpa Cu, M/s Pantnagar
               of industrial products and alloy making.               Fertilizers, Muzaffarnagar)
            Scale of Development                                    •  Recovery of Co from Co bearing slag of South
            •  Pilot  scale  studies  for  production  of  Co,  Cu  and  Ni   Africa  (135  tpa  Co  carbonate,  M/s  Shalina
                                                                      Trading Co Pvt. Ltd., Mumbai)
               cathodes from polymetallic nodules (tested in dedicated
               technology proving plant at 500 kg/day scale (nodules))  •  Recovery of Cu and Zn from spent catalyst (75
            •  Pilot  scale  studies  for  production  of  Ni  and  Co  from   tpa Cu & 75 tpa Zn, M/s S K Enterprise, Kanpur)
               Chromite Over Burden (tested in dedicated pilot plant at   •  Recovery of cobalt  from Beta-cake  leach
                                                                      liquor (18 tpa, M/s HZL, Udaipur) (Current TRL
               10 tpd scale (COB))
            •  Established  flexible  pilot  plant  with  pressure/   Level 6-7)
               atmospheric  leaching,  purification/cementation  tanks,
               solid-liquid  separation,  26  stages  200  lph  solvent-  Techno-economics
                                                                    •  Return on Investment 20-40%
               extraction and electrolytic cells with 100 kg/day metal
               production  capacity    at  CSIR-IMMT  for  processing   Technology Package
               complex sulphides
            •  Pilot  scale studies  to  recover Co  from  cobalt  sludge/  •  IMMT  can  develop  process  flow  sheet  for
                                                                      recovery  of metal values for similar  metal
               scrap
            •  Pilot  scale  studies  for  recovery  of  Ni  from  refinery   bearing resources, carry out pilot scale studies
                                                                      (optional) with the existing pilot plant facility
               electrolyte
            •  Carried out  1000 tons  heap  leaching  for recovery of   and prepare basic engineering process package.
            32
   29   30   31   32   33   34   35   36   37   38   39